Modular Home Floor Plans- Ohio Modular Home Builders
We have many floor plans to choose from. We are in the process of updating this page to include plans for ranch, cape cod, two story and office buildings. Be sure to check back later to see if this page has been updated with the modular floor plans.
Ohio Modular Industry News
Systems Built Homes Process Speed and reliable worth are two major advantages of modular homes. On average, a home will be manufactured in two sections in the manufacturing facility within three weeks, complete with internal finish right down to floor covering and wall finish. The last completion, including fitting together of utilities to the home and a short list of finish work, is usually done by a local contractor familiar with the manufacturer. On the whole a modular home can be ended in 2 to 3 weeks. They can also be set to make two-and three-story buildings.
Superior name brand products that you can depend on
Construction is done in a factory controlled climate which allows for year-round building
Quicker move-in times saves you a lot of cash
Customization and design flexibility
Better materials are used and applied with rigid specifications
Prices for modular homes are usually less than that of a traditionally built home
MODULAR FACTS
Modular home parts are produced in a quality controlled manufacturing environment and shipped to the job site for much faster completion than site-built homes. They normally arrive on-site 95 percent finished and ready to connect to the foundation.